Extracted standards
4 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Other
- Repair completion period after partial destruction18 months
Where a nonconforming structure devoted to a nonconforming activity is damaged less than 50 percent of the cost of reconstructing the entire structure, or where a nonconforming structure is damaged less than 75 percent of the cost of reconstructing the entire structure, either may be repaired or restored; provided, that any such repair or restoration is started within 12 months and completed within 18 months from the date of partial destruction.
- Repair start period after partial destruction12 months
Where a nonconforming structure devoted to a nonconforming activity is damaged less than 50 percent of the cost of reconstructing the entire structure, or where a nonconforming structure is damaged less than 75 percent of the cost of reconstructing the entire structure, either may be repaired or restored; provided, that any such repair or restoration is started within 12 months and completed within 18 months from the date of partial destruction.
- Restoration threshold for nonconformingNonconformingLawful when built, but not compliant with the rules now in force; usually allowed to continue but not to expand. activity50 pct
If a nonconforming activity is destroyed or damaged in any manner to the extent that the cost of restoration to its condition before the occurrence shall exceed 50 percent of the cost of reconstruction the entire activity, it shall be restored only if such use complies with the requirements of this chapter.
- Restoration threshold for nonconformingNonconformingLawful when built, but not compliant with the rules now in force; usually allowed to continue but not to expand. structure75 pct
If a nonconforming structure is destroyed or damaged in any manner to the extent that the cost of restoration to its condition before the occurrence shall exceed 75 percent of the cost of reconstruction the entire structure, it shall be restored only if it complies with the requirements of this chapter.
From the ordinance
If a nonconforming activity is destroyed or damaged in any manner to the extent that the cost of restoration to its condition before the occurrence shall exceed 50 percent of the cost of reconstruction the entire activity, it shall be restored only if such use complies with the requirements of this chapter.