Surry County Unincorporated, Virginia · General provision
Sec. 3-1516(A)2
Dimensional standards
Servicing
- Geographic extent
- Areas for which one-percent annual chance flood elevations have been provided and the floodway has not been delineated.
Extracted standards
2 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Floodplain
- CLOMR for increase >1 foot
Development increasing water surface elevation by more than one foot may be allowed with CLOMR and FEMA approval.
- No development without cumulative analysis
No new construction or development permitted unless cumulative effect does not increase water surface elevation more than one foot.
From the ordinance
Until a regulatory floodway is designated, no new construction, substantial improvements, or other development shall be permitted within the areas of special flood hazard, designated as Zones A1-30 and AE or AH, unless it is demonstrated that the cumulative effect will not increase the water surface elevation of the base flood more than one foot.