Sec. 4-516
Extracted standards
5 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Other
- One-time extension days180 days
A one time extension of up to 180 additional days may be granted by the administrator if substantial reconstruction of the destroyed dwelling has occurred.
- Maximum placement duration12 months
The period for temporary placement of such structures shall be no more than 12 months, unless an extension is specifically authorized by the board of supervisors for an additional period of time to be set by the board.
- Maximum units per lot1 unit
Only one temporary emergency housing unit shall be permitted on any lot of record.
The administrator shall have the authority to waive certain zoning requirements, including setback requirements, on a temporary basis in order to provide for the needs of citizens impacted by the disaster provided that such waiver can be reasonably justified and do not violate floodplain or Chesapeake Bay requirements.
- Zoning permit required
A zoning permit shall be obtained before temporary emergency housing can be placed on the property.
From the ordinance
The period for temporary placement of such structures shall be no more than 12 months, unless an extension is specifically authorized by the board of supervisors.