  • total approved utility-scale solar generation facilities shall not exceed seven percent of developable land within the county or 10,695 acres in total

  • Maximum utility-scale solar as percentage of developable land7 pct

    shall not exceed seven percent of developable land

  • Centroid distance to high-voltage transmission lines1 mile

    the centroid of such facilities shall be within one-mile of existing high-voltage electric transmission lines

From the ordinance

In order to preserve and protect the county's rural ambiance and its agricultural and forestal lands, the board of supervisors determined that the total approved utility-scale solar generation facilities shall not exceed seven percent of developable land within the county or 10,695 acres in total. Land calculation is based on the entire acreage for parcel seeking a conditional use permit. Siting agreements between the county and the developer shall be required. In addition, the centroid of such facilities shall be within one-mile of existing high-voltage electric transmission lines. Such facilities are permitted only in the (M-1) Light Industrial and the (M-2) General Industrial Zoning Districts.