Sec. 23-7.2A.3
Extracted standards
2 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Other
- Engineering study required if spillway standards change
If the state department of conservation and recreation determines that the proposed development is wholly or partially within a dam break inundation zone and would change any spillway design flood standards for an impounding structure, the developer must submit an engineering study meeting state standards to the state department of conservation and recreation prior to final approval of the proposed development.
- Review required for 3+ residential units
For any development containing three (3) or more residential units or any business or industrial use other than agricultural production proposed within the boundaries of a mapped dam break inundation zone, the director of planning shall (i) review the dam break inundation zone map, (ii) notify the dam owner, and (iii) within ten (10) days forward a request to the state department of conservation and recreation to make a determination of the potential impacts of the proposed development on spillway design flood standards required for the dam.
From the ordinance
For any development containing three (3) or more residential units or any business or industrial use other than agricultural production proposed within the boundaries of a mapped dam break inundation zone, the director of planning shall review...