Extracted standards
5 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Other
- Site plan approval expiration12 months
An approved site plan shall expire and become null and void if no building permit has been obtained for the site within 12 months after the approval
- Topography contour interval2 ft
Topography of the project area with contour intervals of two feet or less.
- Site plan scale50 ft_per_inch
The scale shall not be less than 50 feet to one inch.
- Easement setbackSetbackThe distance a building must be held back from a lot line. from building5 ft
The nearest edge of any easement shall be a minimum of five feet from any building.
- Minimum utility easement width20 ft
The minimum utility easement width shall be 20 feet.
From the ordinance
The minimum utility easement width shall be 20 feet. The nearest edge of any easement shall be a minimum of five feet from any building.