§ 175-23.3
Dimensional standards
Uses
Extracted standards
4 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Other
- Abandonment period12 months
The Zoning Administrator may order the removal of any telecommunications structure/facility when use of the facility has been discontinued or the facility has not been used for its permitted purpose for 12 consecutive months.
- Preexisting towers
Existing, permitted, nonconforming telecommunications towers and facilities may have antenna(s) added, moved or replaced on said structures upon review and approval of the Department of Planning and Zoning.
- Structural requirements
All facilities/structures shall meet the structural requirements for same as set forth in the Uniform State-wide Building Code.
- Zoning permit required
No telecommunications facility structure, unless herein exempted, shall be erected, constructed, altered, or relocated except as provided in this article and in these regulations, until a zoning permit has been approved and issued by the Mathews County Department of Planning and Zoning.
From the ordinance
The maximum height of a permitted data pole, including the antenna, shall not exceed 120 feet in height from grade. Telecommunications facility structures, with the exception of telecommunications towers, shall be set back a minimum of 50 feet from the edge of public rights-of-way in all zoning districts.