Mathews County Unincorporated, Virginia · General provision

§ 175-20.2A(1)

Dimensional standards

Servicing

Applies near
RPA boundary line, tidal/non-tidal wetland, setbackSetbackThe distance a building must be held back from a lot line. lines
Applies within
10 ft
Geographic extent
Applies within 10 feet of any front, rear, side or corner side setbackSetbackThe distance a building must be held back from a lot line., RPA boundary line, or tidal/non-tidal wetland.

Extracted standards

1 individual requirements pulled out of this section’s prose, each with the sentence it came from.

Other

From the ordinance

A setback verification survey prepared by a Virginia licensed surveyor is required whenever any building or addition is being constructed within a Resource Protection Area (RPA) or within 10 feet of any front, rear, side or corner side setback; RPA boundary line; or tidal or non-tidal wetland.
§ 175-20.2A(1)