Mathews County Unincorporated, Virginia · General provision
§ 175-20.2A(1)
Dimensional standards
Servicing
- Applies near
- RPA boundary line, tidal/non-tidal wetland, setbackSetbackThe distance a building must be held back from a lot line. lines
- Applies within
- 10 ft
- Geographic extent
- Applies within 10 feet of any front, rear, side or corner side setbackSetbackThe distance a building must be held back from a lot line., RPA boundary line, or tidal/non-tidal wetland.
Extracted standards
1 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Other
- SetbackSetbackThe distance a building must be held back from a lot line. verification survey required10 ft
Survey required when building within 10 feet of setback, RPA boundary, or wetland.
From the ordinance
A setback verification survey prepared by a Virginia licensed surveyor is required whenever any building or addition is being constructed within a Resource Protection Area (RPA) or within 10 feet of any front, rear, side or corner side setback; RPA boundary line; or tidal or non-tidal wetland.