Mathews County Unincorporated, Virginia · General provision
§ 175-15.18
Extracted standards
1 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Setback
- Shoreline setbackSetbackThe distance a building must be held back from a lot line. measurement
Every shoreline setback required by this chapter shall be measured as the shortest distance between any point on the shoreline and any point on the building, structure or use subject to such setback requirement.
From the ordinance
Every shoreline setback required by this chapter shall be measured as the shortest distance between any point on the shoreline and any point on the building, structure or use subject to such setback requirement.