Mathews County Unincorporated, Virginia · General provision
§175-15.18
Extracted standards
1 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Other
- Shoreline setbackSetbackThe distance a building must be held back from a lot line. measurement
Shoreline setback measured as shortest distance between shoreline and building. BZA may waive if water access necessary.
From the ordinance
Every shoreline setback required by this chapter shall be measured as the shortest distance between any point on the shoreline and any point on the building, structure or use subject to such setback requirement. The Board of Zoning Appeals may waive shoreline setback and permit a principal building on or near the shoreline where access to proximity to the water is reasonably necessary to the operation of the facility.