Mathews County Unincorporated, Virginia · General provision

§175-15.13

Dimensional standards

lot requirementsSTREETbuildable areaRear 20 ftSide 10 ftMIN OPEN SPACE40%
Plan view of the district’s stated lot requirements. Solid line: the property line. Dashed: the setback lines the ordinance imposes; a building must stay inside the tinted envelope. Drawn from the figures extracted below — illustrative, not a survey.

Extracted standards

3 individual requirements pulled out of this section’s prose, each with the sentence it came from.

Other

From the ordinance

Cluster development of multifamily dwellings shall be permitted with conditional use permit in the Business-2 (B-2) Zoning District provided that site plan approval shall be required for any cluster development prior to issuance of a conditional use permit. Cluster development of single-family dwellings shall be permitted by right in the RU, R-1, and R-2 Zoning Districts. ... There are no lot width or area requirements. ... The minimum setback from external streets shall be that which is prescribed in the underlying zoning district. The minimum setback from internal streets shall be 30 feet. Side yard setbacks on each individual lot shall be a minimum of 10 feet, and rear yard setbacks shall be a minimum of 20 feet. No less than 40% of the gross area of a cluster development shall be reserved as common open space...
§175-15.13