Madison County Unincorporated, Virginia · General provision

Article III, Section 3.1.A.2

Dimensional standards

Servicing

Geographic extent
Areas designated as AE on the FIRM

Extracted standards

1 individual requirements pulled out of this section’s prose, each with the sentence it came from.

Other

  • No development unless cumulative effect does not increase BFE by more than 1 foot1 ft

    Until a regulatory floodway is designated, no new construction, substantial improvements, or other development (including fill) shall be permitted within the areas of special flood hazard, designated as AE on the FIRM, unless it is demonstrated that the cumulative effect of the proposed development, when combined with all other existing and anticipated development, will not increase the water surface elevation of the base flood more than one foot at any point within Madison County.

From the ordinance

Until a regulatory floodway is designated, no new construction, substantial improvements, or other development (including fill) shall be permitted within the areas of special flood hazard, designated as AE on the FIRM, unless it is demonstrated that the cumulative effect of the proposed development, when combined with all other existing and anticipated development, will not increase the water surface elevation of the base flood more than one foot at any point within Madison County.
Article III, Section 3.1.A.2