Extracted standards
1 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Signage
- Sign permit required
A sign permit shall be required prior to the construction, erection, installation, attachment or modification of any permanent or temporary sign that is not specifically exempted.
From the ordinance
A sign permit shall be required prior to the construction, erection, installation, attachment or modification of any permanent or temporary sign that is not specifically exempted from the requirement for a sign permit.