Dimensional standards
Uses
Permitted by right5
Conditional / special use3
- wireless support structure 50-150 ft in height
- base station exceeding 72 cu ft or 6 ft height
- co-location with height increase (max 15 ft)
Extracted standards
2 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Other
- Wireless structure setbackSetbackThe distance a building must be held back from a lot line. for >35 ft heightMaximum heightThe tallest a building may be, given in feet, in storeys, or both — whichever binds first.
Any wireless support structure and/or wireless facility greater than 35 feet in height in the R-C, R-1, R-2, R-3, R-4, IN-1, or B-4 Districts shall be required to set back a distance from all property lines at least the height of such structure and/or facility. (Sec 35.2-73.9(b))
- Wireless structure setbackSetbackThe distance a building must be held back from a lot line. for ≤35 ft heightMaximum heightThe tallest a building may be, given in feet, in storeys, or both — whichever binds first.0 ft
There shall be no setback requirement for any wireless support structure and/or wireless facility that is 35 feet or less in height. (Sec 35.2-73.9(a))
From the ordinance
In B-4, standard process projects between 50 and 150 ft require CUP. Setback for >35 ft is height. Short term rental permitted by right.