Dimensional standards
Servicing
- Applies near
- military base, military installation, military airport, or licensed public-use airport
- Applies within
- 3,000 ft
- Geographic extent
- Applies to notice requirements for properties within 3,000 feet of a military base, military installation, military airport, or licensed public-use airport.
Extracted standards
8 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Other
- Notice to military base prior to hearing30 days
Written notice shall also be given, at least 30 days before the hearing to the commander of the military base.
- Adjacent property owner response period for minor exceptions21 days
The adjoining and adjacent property owners shall be given an opportunity to respond to the request within 21 days of the date the notice is mailed.
- Notification lettering heightMaximum heightThe tallest a building may be, given in feet, in storeys, or both — whichever binds first.3 inches
The lettering thereon shall be black letters on a white background measuring at least three inches in height.
- Notification sign heightMaximum heightThe tallest a building may be, given in feet, in storeys, or both — whichever binds first.72 inches
Signs shall be of wood or metal, at least 48 inches by 72 inches in size.
- Notification sign interval for long frontageFrontageThe length of a lot line that touches a public street.500 feet
For properties with more than 500 feet of frontage, signs shall be placed on the property by the applicant at 500-foot intervals.
- Notification sign posting period before hearing30 days
Notification signs shall be posted at least 30 days prior to the initial public hearing.
- Notification sign removal after final action10 days
The applicant shall remove the sign within ten calendar days of final action on the application.
- Notification sign width48 inches
Signs shall be of wood or metal, at least 48 inches by 72 inches in size.
From the ordinance
When a proposed Comprehensive Plan or amendment thereto, a Zoning Map amendment, or conditional use permit for a change in use involves any parcel of land located within 3,000 feet of a boundary of a military base... written notice shall also be given, at least 30 days before the hearing to the commander.