- SetbackSetbackThe distance a building must be held back from a lot line. verification survey
A setback verification survey is required whenever any building or addition is being constructed within a resource protection area or within two feet of any street, side yard, rear yard, or tidal/non-tidal wetland setback. Survey must be certified by a licensed land surveyor.
From the ordinance
A setback verification survey is required whenever any building or addition is being constructed within a resource protection area or within two feet of any: Street (right-of-way) setback, Side yard setback, Rear yard setback, Tidal or non-tidal wetland setback.