King George County Unincorporated, Virginia · General provision

Section 8-8-2, 8-8-4(B), 8-8-5(C), 8-8-6(B)(3)

Extracted standards

4 individual requirements pulled out of this section’s prose, each with the sentence it came from.

Other

  • Certificate required for private well/septic

    Private wells and on-site sewage disposal systems shall not be constructed within the County unless and until a certificate is obtained from the County Engineer stating that a public connection is not accessible to the property

  • All private wells, when possible, shall be setback 15 ft. from all property lines.

  • Reserve drainfield required100 pct

    All newly constructed structures served by on-site sewage disposal systems to which this Division applies shall have a 100% reserve to drainfield in addition to a primary drainfield

  • Connection to public sewer/water required

    Connection to the King George County Service Authority shall be required as provided in the King George County Service Authority Regulations.

From the ordinance

Connection to the King George County Service Authority shall be required as provided in the King George County Service Authority Regulations. ... Private wells and on-site sewage disposal systems shall not be constructed within the County unless and until a certificate is obtained from the County Engineer stating that a public connection is not accessible ... All newly constructed structures served by on-site sewage disposal systems ... shall have a 100% reserve to drainfield ... All private wells, when possible, shall be setback 15 ft. from all property lines.
Section 8-8-2, 8-8-4(B), 8-8-5(C), 8-8-6(B)(3)