Design

  • Principal façade requirements

    Principal façade requirements apply to all building facades that face adjacent existing or planned public roads or that face an adjacent property with existing residential development...

Noise

  • Generator testing hours

    Generator testing shall be limited to weekdays between 8:00 a.m. and 5:00 p.m.

Other

  • Ground mounted mechanical equipment is prohibited in front yards.

  • Mechanical equipment screening

    Power generators, water cooling systems, storage facilities and any other mechanical infrastructure... shall be within an enclosed structure screened as not to be visible from any adjacent street, use, or building.

  • Transitional buffers allowed

    Transitional buffers allowed include Type C and Alternative Buffer Berms as supplied in Article VIII, Community Design Standards.

  • Public/community water connection required for water-based cooling

    Data centers shall be connected to public or community water system if a water-based cooling system is utilized.

From the ordinance

Due to the high-water demand, data centers shall be connected to public or community water system if a water-based cooling system is utilized.
Section 7-6-5