King George County Unincorporated, Virginia · General provision

Section 7-5-10

Extracted standards

6 individual requirements pulled out of this section’s prose, each with the sentence it came from.

Other

  • Hours of operation

    Hours of operation shall be limited to 7:00 a.m. to 8:00 p.m.

  • Maximum duration per use60 days

    Each use shall be permitted for a period not to exceed 60 consecutive days.

  • Maximum permits per year4 permits

    No more than 4 permits shall be issued for the same lot during a calendar year.

  • Minimum days between permits30 days

    A minimum of 30 consecutive days after a permit issued to that applicant for the same or an adjacent lot or parcel has expired.

Parking

  • Parking on site

    Parking shall be supplied on the site of the primary use and not along the public right-of-way.

Setback

From the ordinance

No more than 4 permits shall be issued for the same lot during a calendar year. ... Each use shall be permitted for a period not to exceed 60 consecutive days. ... The outdoor sales use or display shall be setback at least 15 ft. from any public right-of-way.
Section 7-5-10