King George County Unincorporated, Virginia · General provision
Section 4-2-4
Extracted standards
2 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Other
- Maximum utility easement area10 pct
Land restricted for building by utility easements shall be considered unusable and shall account for no more than 10% of the minimum required area on any lot.
- Maximum water area20 pct
Lot area for the purpose of satisfying minimum area requirements shall not include portions under water, except where the total area of a body of water is within the lot and/or constitutes less than 20% of the lot area.
From the ordinance
Land restricted for building by utility easements shall be considered unusable and shall account for no more than 10% of the minimum required area on any lot.