Article VIII, Sec. 8-1010 and 8-1011
Dimensional standards
Height & bulk
- Minimum landscaping
- 12%
Extracted standards
4 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Other
- Time to install landscaping after temporary CO12 months
All required landscaping shall be installed within twelve (12) months following the issuance of a temporary certificate of occupancy
- Landscaping surety percentage of cost25 pct
Surety in an amount equal to twenty-five percent (25%) of the cost of materials and installation of landscaping, screening and buffering materials, including fences, shall be provided
- Surety release period2 years
This surety shall be released at the end of two (2) years from the issuance of a final certificate of occupancy or final inspection date
- Temporary certificate of occupancy surety contingency percentage10 pct
a temporary certificate of occupancy may be issued only if the owner or developer provides a form of surety satisfactory to the county attorney in an amount equal to the costs of labor and materials plus ten percent (10%) contingency allowance
From the ordinance
When landscaping is required, no certificate of occupancy shall be issued until the required landscaping is completed... a temporary certificate of occupancy may be issued only if the owner or developer provides a form of surety satisfactory to the county attorney in an amount equal to the costs of labor and materials plus ten percent (10%) contingency allowance... All required landscaping shall be installed within twelve (12) months following the issuance of a temporary certificate of occupancy... Surety in an amount equal to twenty-five percent (25%) of the cost of materials and installation of landscaping, screening and buffering materials, including fences, shall be provided... This surety shall be released at the end of two (2) years