Irvington, Virginia · General provision

§ 154.215

Extracted standards

7 individual requirements pulled out of this section’s prose, each with the sentence it came from.

Other

  • Army Corps permit required if encroaching beyond 1/4 waterway width

    A permit must be obtained from the United States Army Corps of Engineers before a dock/pier can be built/constructed in cases where the proposed dock/pier will encroach beyond one-fourth the waterway width (as determined by measuring mean high water to mean high water or ordinary high water mark to ordinary high water high).

  • Maximum L/T head width8 ft

    with or without an 'L' or 'T' head not to exceed eight feet

  • Maximum dock length25 ft

    25 feet long

  • Maximum dock width6 ft

    six feet wide or less

  • A finger pier or boat house (fixed or floating) is not allowed.

  • State Marine Resources Commission authorization required

    An application must be submitted to the State Marine Resources Commission requesting authorization before a dock/pier can be built or constructed.

  • Zoning permit required

    Docks or piers shall not be built or constructed or rebuilt or reconstructed until a zoning permit is obtained from the zoning administrator for the town.

From the ordinance

This subchapter pertains to any dock or pier, six feet wide or less, with or without an 'L' or 'T' head not to exceed eight feet and 25 feet long, for private use. A finger pier or boat house (fixed or floating) is not allowed.
§ 154.215