Extracted standards
14 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Other
- Abandonment period2 years
If any nonconforming use (structure or activity) is discontinued for a period exceeding two years after the enactment of this chapter, it shall be deemed abandoned
- Activity extension within designed area
A nonconforming activity may be extended throughout any part of a structure which was arranged or designed for such activity at the time of enactment of this chapter.
- Advertising structure relocation period6 months
advertising structures that become nonconforming because of a rezoning have six months within which to relocate in a permitted area
- Change to more limited use
Whenever a nonconforming structure, lot or activity has been changed to a more limited nonconforming use, such existing use may only be changed to an even more limited use
- DistrictZoning districtA mapped area with one set of rules, identified by a code like R-1 or B-2. boundary change subject
Whenever the boundaries of a district are changed, any uses of land or buildings which become nonconforming as a result of such change shall become subject to the provisions of this subchapter.
- Extension must conform
A nonconforming structure to be extended or enlarged shall conform with the provisions of this chapter.
- Footprint increase prohibitedProhibitedNot allowed in the district at all, short of rezoning or a variance.0 none
the structure footprint (length, width and cubit) shall not be increased
Any lot of record at the time of the adoption of this chapter which is less in area or width than the minimum required by this chapter may be used when the requirements of the governing body regarding setback, side and rear yards are met
- Permit completion period for building12 months
provided such building is completed within one year
- Restoration completion period18 months
and completed within 18 months from the date of partial destruction
- Restoration start period12 months
provided any such repair or restoration is started within 12 months
- Restoration cost threshold75 pct
If a nonconforming activity is destroyed or damaged in any matter to the extent that the cost of restoration to its condition before the occurrence shall exceed 75 percent of the cost of reconstructuring the entire activity or structure, it shall be restored only if such use compiles with the requirements of this chapter
- Temporary seasonal nonconformingNonconformingLawful when built, but not compliant with the rules now in force; usually allowed to continue but not to expand. uses excluded
Temporary seasonal nonconforming uses that have been in continual operation for a period of two years or more prior to the effective date of this chapter are excluded
- Use establishment period30 days
or such use of land is established within 30 days after the effective date of this chapter
From the ordinance
If at the time of enactment of this chapter, any legal activity which is being pursued, or any lot or structure legally utilized in a manner or for a purpose which does not conform to the provisions of this chapter, such manner of use or purpose may be continued as herein provided