Extracted standards
3 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Other
- Commission must act within 30 days30 days
In any case in which the commission is required to review an application for a zoning permit, a special use permit or any other type of application or matter the commission shall act on any application or matter received within 30 days after receiving the same.
- Inspection warrants may be obtained for enforcement
The zoning administrator, or duly authorized agent, shall have the authority to apply for the issuance of inspection warrants for the purpose of enforcing the provisions of this article.
- SetbacksSetbackThe distance a building must be held back from a lot line. may be altered for future road widening
Whenever there shall be plans in existence approved by either the state department of highways or by the town council for the widening of any street or highway, the commission may recommend additional front yard setbacks for any new construction or for any structures altered or remodeled adjacent to the future planned right-of-way.
From the ordinance
Commission must act within 30 days. Commission may recommend additional front yard setbacks for future road widening. Inspection warrants may be obtained for enforcement.