10 individual requirements pulled out of this section’s prose, each with the sentence it came from.

Height

Noise

  • Noise ordinance compliance

    All large- and utility-scale solar energy facilities must comply with the town noise ordinance.

Other

  • Decommissioning removal depth36 inches

    Decommissioning shall include the removal of all solar collectors, cabling, electrical components, fencing and any other associated equipment, facilities and structures to a depth of at least 36 inches.

  • Decommissioning time after cessation12 months

    The owner or operator of a large- or utility-scale solar energy facility shall completely decommission a facility within 12 months if the facility ceases to generate electricity for a continuous period of 12 months.

  • Maximum distance to transmission line2 miles

    Utility-scale solar energy facilities shall be located no more than two miles from an existing electrical transmission line.

  • Maximum panel coverage density70 pct

    Density of panel coverage over the entire site area shall be no more than 70 percent.

  • All aspects and components associated with a solar energy facility shall be no less than 150 feet from any property line.

  • The project area shall be no less than 200 feet from the property line of any residential use located outside of the project area.

  • UL listing required

    All large- and utility-scale solar energy facilities shall utilize components which has a UL listing or equivalent and fully comply with all applicable building and electrical codes.

Signage

  • Warning signage

    Warning signage shall be placed on solar equipment and facilities to the extent appropriate.

From the ordinance

Ground-mounted large-scale solar energy facilities shall be by special use permit in the Industrial District I-1.
Sec. 28-708 through 28-712