Extracted standards
3 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Other
- Application must include scale drawing
Each application for a zoning permit shall be accompanied by three copies of a scale drawing showing size and shape of parcel, nature of use, off-street parking, and location relative to property lines and right-of-way.
- Certificate of occupancy required before use or occupancy
Land may be used or occupied and buildings structurally altered or erected and may be used or changed in use only after a certificate of occupancy has been issued by the administrator.
- Zoning permit required before construction or change of use
No buildings or structures shall be started, reconstructed, enlarged, altered, and no change in the use of a building shall occur, until a zoning permit has been obtained from the administrator.
From the ordinance
No buildings or structures shall be started, reconstructed, enlarged, altered, and no change in the use of a building shall occur, until a zoning permit has been obtained from the administrator. Land may be used or occupied and buildings structurally altered or erected and may be used or changed in use only after a certificate of occupancy has been issued by the administrator.