Sec. 24-5801 through 24-5803
Dimensional standards
Servicing
- Applies near
- Chesapeake Bay
- Applies within
- 100 ft
- Geographic extent
- Chesapeake Bay Preservation Areas including Resource Protection Areas (RPAs) and Resource Management Areas (RMAs)
Extracted standards
9 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Environmental
- Maximum number of ingress/egress points during construction1 count
Ingress and egress during construction must be limited to one access point unless otherwise approved by the County Engineer.
- Maximum encroachment into seaward portion of buffer50 ft
The encroachment may not extend into the seaward 50 feet of the buffer area.
- Buffer reduction for sediments75 pct
The 100-foot-wide buffer area will be deemed to achieve a 75 percent reduction of sediments and a 40 percent reduction of nutrients.
- Buffer reduction for nutrients40 pct
The 100-foot-wide buffer area will be deemed to achieve a 75 percent reduction of sediments and a 40 percent reduction of nutrients.
- Minimum vegetated buffer width in RPA100 ft
A vegetated buffer area no less than 100 feet in width located adjacent to and landward of the components listed in subsections (a) through (d) above and along both sides of any water body with perennial flow.
- Required reduction in nonpoint source pollution for previously developed land without BMP10 pct
achieve a ten percent reduction in nonpoint source pollution from development on previously developed land where the runoff was not treated by one or more BMPs
- Required reduction in nonpoint source pollution for agriculturalAgricultureRaising crops or livestock, generally including the structures that serve them. and silvicultural uses40 pct
achieve a 40 percent reduction in nonpoint source pollution from agricultural and silvicultural uses
- Land disturbance threshold requiring erosion control2,500 sqftsq ftSquare feet. An acre is 43,560 sq ft; a typical suburban lot is 7,000–10,000.
Any land disturbing activity of 2,500 square feet or more (including construction of all single-family dwellings, septic tanks, and drainfields) must comply with article II of Chapter 10 of the County Code.
- Septic tank inspection frequency5 years
Owners of all individual onsite sewage disposal systems that do not require a VPDES permit must, at least once every five years, either pump out their septic tanks and submit documentation thereof, or submit documentation ... that the onsite sewage disposal system has been inspected within the last five years
From the ordinance
The RPA will consist of: ... (e) A vegetated buffer area no less than 100 feet in width located adjacent to and landward of the components listed in subsections (a) through (d) above and along both sides of any water body with perennial flow.