Henrico County Unincorporated, Virginia · General provision

Sec. 24-4331

Extracted standards

6 individual requirements pulled out of this section’s prose, each with the sentence it came from.

Other

  • CDD landfill Transitional Buffer 50

    must provide a Transitional Buffer 50 around its perimeter

  • Recycling processing center distance from Residential250 ft

    The center must be located at least 250 feet from any Residential district or any lot on which the principal use is a dwelling.

  • Salvage/junkyard distance from public right-of-way500 ft

    A salvage and junkyard must not be located within 500 feet of a public right-of-way

  • The minimum site area for a sanitary landfill is 50 acres.

  • Solid waste transfer station distance from Residential250 ft

    A solid waste transfer station must not be located within 250 feet of any Residential district or any lot on which the principal use is a dwelling.

Setback

From the ordinance

A construction, demolition, and debris ("CDD") landfill must be set back at least 300 feet from any existing residential use, school, or childcare center, and must provide a Transitional Buffer 50 around its perimeter. ... The minimum site area for a sanitary landfill is 50 acres. ... A recycling processing center must be located at least 250 feet from any Residential district or any lot on which the principal use is a dwelling. ... A salvage and junkyard must not be located within 500 feet of a public right-of-way. ... A solid waste transfer station must not be located within 250 feet of any Residential district or any lot on which the principal use is a dwelling.
Sec. 24-4331