Henrico County Unincorporated, Virginia · General provision

Sec. 24-4517

Extracted standards

2 individual requirements pulled out of this section’s prose, each with the sentence it came from.

Other

  • Maximum use as dwelling1 year

    The building must not be used as a dwelling for more than one year unless expressly authorized in a Declaration of Emergency issued in response to the catastrophe.

  • Removal or conversion within 30 days after CO for permanent dwelling30 days

    The building must be removed or converted to an authorized accessory use within 30 days after issuance of the certificate of occupancy for the permanent principal dwelling. The building must not be used as a dwelling for more than one year unless expressly authorized in a Declaration of Emergency issued in response to the catastrophe.

From the ordinance

An existing building that is accessory to an existing principal dwelling that has been damaged or destroyed by a fire, hurricane, or other physical catastrophe may be temporarily used as the principal dwelling on the lot while the damaged or destroyed principal dwelling is being repaired or reconstructed, provided it complies with the following standards:
Sec. 24-4517