Hampton, Virginia · General provision

Section 3-3(35)(i)

Extracted standards

1 individual requirements pulled out of this section’s prose, each with the sentence it came from.

Other

  • Vegetation removal distance from shoreline100 ft

    removed from all slopes prior to the pit being filled with water for a distance of one hundred (100) linear feet from the ultimate shore line

From the ordinance

All woody vegetation and debris will be removed from all slopes prior to the pit being filled with water for a distance of one hundred (100) linear feet from the ultimate shore line.
Section 3-3(35)(i)