Extracted standards
2 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Other
- SWECS placement in front yardYardThe open space left between a building and its lot line — the space a setback creates. prohibitedProhibitedNot allowed in the district at all, short of rezoning or a variance.
Placement in the front yard is prohibited.
- Minimum SWECS setbackSetbackThe distance a building must be held back from a lot line. (equal to heightMaximum heightThe tallest a building may be, given in feet, in storeys, or both — whichever binds first.)
The minimum setback for a SWECS from a property line, public right-of-way, or public overhead utility line must be a distance which is at least equal to the total height of the SWECS.
From the ordinance
The minimum setback for a SWECS from a property line, public right-of-way, or public overhead utility line must be a distance which is at least equal to the total height of the SWECS. Placement in the front yard is prohibited.