Goochland County Unincorporated, Virginia · General provision
Article 31, Sec. 15-500
Extracted standards
1 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Other
- SetbackSetbackThe distance a building must be held back from a lot line. measurement method
Front, rear, and side yard setbacks are measured from the existing right-of-way, access easement, or property line, and then in a straight line to the closest point of the building or structure.
From the ordinance
Setback. The minimum distance any building or structure must be located from a lot line. Front, rear, and side yard setbacks are measured from the existing right-of-way, access easement, or property line, and then in a straight line to the closest point of the building or structure.