Dimensional standards
Servicing
Extracted standards
3 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Floodplain
- Development subject to Chapter 175
All development within floodplain areas, as established by Chapter 175, Sections 76 through 78 of the Town Code, including dam and impounding structure break zones, shall be subject to the regulations of Chapter 175, Sections 74 through 81.3 of the Town Code.
- FloodplainFloodplainLand expected to flood at a stated frequency, where building carries extra conditions. maintained natural
Except where floodplain development is permitted, floodplain areas shall be maintained in their natural state.
- Platting in floodplainFloodplainLand expected to flood at a stated frequency, where building carries extra conditions.
Land within a 100-year floodplain may be platted, provided that such lands are not used to meet the minimum required lot size and are designated on the plats as a floodplain easement area and that the subdivision would not necessitate changes to topographic conditions that alter the floodway district.
From the ordinance
Land within a 100-year floodplain may be platted, provided that such lands are not used to meet the minimum required lot size and are designated on the plats as a floodplain easement area.