Front Royal, Virginia · General provision

148-840

Extracted standards

8 individual requirements pulled out of this section’s prose, each with the sentence it came from.

Other

  • Cul-de-sac water line loop requirement threshold300 ft

    water lines serving any cul-de-sac or other dead-end street exceeding three hundred (300) feet in length shall be connected back in a loop

  • Minimum utility easement width for overhead electric20 ft

    twenty (20) feet for overhead electric facilities

  • Minimum utility easement width for underground electric10 ft

    Utility easements with a minimum width of ten (10) feet for underground electric facilities

  • Sanitary sewer connection required if available

    Connection to the Town sanitary sewer system shall be required, if available.

  • 10-year post-development peak rate not to exceed predevelopment

    the ten-year post-development peak rate of runoff from the land development shall not exceed the ten-year predevelopment peak rate of runoff.

  • 2-year post-development peak rate and velocity not to exceed predevelopment

    the two-year post-development peak rate and velocity of runoff from the land development shall not exceed the two-year pre-development peak rate and velocity of runoff.

  • Underground wiring required for new subdivisions

    All electric, telephone, television and other communication lines, both main and service connections, installed for new subdivisions or developments shall be made by underground wiring.

  • Complete water main system required

    Complete water main line systems installed in accordance with plans and specifications approved by the Town shall be required improvements in each subdivision or development

From the ordinance

Connection to the Town sanitary sewer system shall be required, if available.
148-840