Elkton, Virginia · General provision

Article IX, Subdivision Regulations

Extracted standards

32 individual requirements pulled out of this section’s prose, each with the sentence it came from.

Floodplain

Other

  • Advertising water/sewage disclosure

    A subdivider, when advertising a subdivided tract of land for sale, shall be specific as to whether or not officially approved water and sewage facilities are available

  • Concrete monument diameter4 in

    Concrete monuments four inches in diameter or square

  • Council action time60 days

    The Town Council shall act on proposed final plats within 60 days

  • activities disturbing 10,000 or more square feet of land

  • Final plat required

    No lot shall be sold until a final plat for the subdivision shall have been approved and recorded

  • Final plat time limit6 months

    The subdivider shall have not more than six months after receiving official notification concerning the preliminary plat to file with the Administrator a final subdivision plat

  • Fire hydrants required

    The installation of adequate fire hydrants in a subdivision at locations and quantities approved by the County Fire Marshall is required

  • Half streets along the boundary of land proposed for subdivision shall not be permitted

  • Iron pipe monument diameter0.75 in

    iron pipe not less than 3/4 inch in diameter and 24 inches long

  • Land reservation for public purposes

    The Town may require subdividers of residential subdivisions to set aside land for parks, playgrounds, schools, libraries, municipal buildings

  • Lot abut on street required

    Each lot shall abut on a street dedicated by the subdivision plat

  • Lot shape restriction

    Lots shall not contain peculiarly shaped elongations solely to provide necessary square footage

  • Lot side lines angle90 deg

    Side lines of lots shall be approximately at right angles, or radial to the street line

  • Maximum block length1,200 ft

    The maximum length of blocks shall be 1,200 feet

  • Minimum alley right-of-way20 ft

    Rights-of-way for alleys will be no less than 20 feet

  • Minimum base material depth6 in

    Base material shall be compacted to a minimum depth of six inches

  • Minimum base material width30 ft

    installed to a minimum width of 30 feet for streets and 12 feet for alleys

  • Minimum block length500 ft

    minimum length of blocks upon which lots have frontage shall be 500 feet

  • Minimum cul-de-sac turnaround diameter100 ft

    turnaround of not less than 100 feet in diameter

  • Minimum pavement width30 ft

    pavement width of 30 feet

  • Minimum right-of-way width50 ft

    all streets shall have, as a minimum, a right-of-way width of 50 feet

  • Minimum utility easement width20 ft

    Easements of not less than 20 feet in width shall be provided for water, sewer, power lines, and other utilities

  • Performance bond required

    The subdivider's performance bond shall not be released until construction has been inspected and approved

  • Preliminary plat required

    the subdivider shall submit a preliminary plat to the Administrator

  • Public water/sewer extension required

    Where public water and/or sewer is available, the service shall be extended to all lots within a subdivision by the developer

  • Remnant land disposition

    Land subject to flooding, land deemed to be topographically unsuitable for residential occupancy and all remnants of lots below minimum size must be added to adjacent lots, or become the property of a homeowners' association

  • There shall be no reserve strips controlling access to public streets

  • Septic tank approval required

    The governing body shall not approve any subdivision where sanitary sewers are not provided unless it shall receive in writing from the Health Department

  • Street identification signs required

    Street identification signs of an approved design shall be installed at all intersections

  • Street intersection angle90 deg

    streets should intersect at right angles

  • Duplication of existing street names is prohibited for new streets

From the ordinance

All streets shall have, as a minimum, a right-of-way width of 50 feet and a pavement width of 30 feet.
Article IX, Subdivision Regulations