Extracted standards
1 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Other
- Maximum projection into required yardYardThe open space left between a building and its lot line — the space a setback creates.2 ft
projections shall not extend into the required yard areas for a distance exceeding two feet.
From the ordinance
No part of a yard or other open space required for any building... shall be included as part of a yard or other open space similarly required for another building. Every part of a required yard or court shall be open from its lowest point to the sky unobstructed, except as otherwise provided herein, for the ordinary projection of sills, cornices, buttresses, ornamental features, chimneys, flues, and eaves provided such projections shall not extend into the required yard areas for a distance exceeding two feet.