Dumfries, Virginia · General provision

Sec. 70-23

Extracted standards

7 individual requirements pulled out of this section’s prose, each with the sentence it came from.

Other

  • Wait after adjoining lot permit expiration30 days

    No temporary use permit shall be issued to an applicant until at least 30 days after any permit issued to that applicant on an adjoining lot has expired.

  • Maximum active temporary use permits per lot1 permits

    Only one temporary use permit can be active on a lot at any time, unless an event or activity is sponsored, managed or operated by a nonprofit organization, and in the judgment of the zoning administrator, adequate space exists for two temporary uses

  • Minimum separation between events30 days

    Each activity or event shall be separated by a period of not less than 30 consecutive days from the previous event on that lot

  • Nonprofit representative required on site

    For any temporary activity sponsored, managed or operated by a nonprofit organization, a representative from the nonprofit organization shall be present at the activity at all times it is in operation.

  • Nonprofit tax exempt documentation required

    Nonprofit organizations shall submit a copy of tax exempt status or other documentation with the temporary use permit application

  • All temporary activities and any appurtenant structures, signs, goods and other features must be set back from any public right-of-way at least 20 feet.

  • Maximum denial period for violations12 months

    The zoning administrator may deny approval of all temporary activities on a site for a period of up to one year if any temporary activity is commenced without or prior to all required approvals

From the ordinance

All temporary activities and any appurtenant structures, signs, goods and other features must be set back from any public right-of-way at least 20 feet.
Sec. 70-23