Dimensional standards
Extracted standards
10 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Other
- Maximum carnival/circus duration14 days
Carnivals, circuses, craft fairs, concerts, flea markets, car shows, meetings, religious activities not held on church property, business catered events, and similar outdoor activities, for a period not to exceed 14 days
- Maximum food vendor freestanding sign heightMaximum heightThe tallest a building may be, given in feet, in storeys, or both — whichever binds first.4 ft
Free standing signs are limited to sandwich board type signs no higher than four feet in height.
- Maximum food vendor hours per day12 hours
no more than 12 hours a day, six days a week
- Maximum food vendor sign area20 sqftsq ftSquare feet. An acre is 43,560 sq ft; a typical suburban lot is 7,000–10,000.
Signage shall not exceed 20 square feet in total area.
- Maximum roadside stand duration30 days
Roadside stands for the temporary retail sales of seasonal and holiday goods, excluding fireworks, for a period not to exceed 30 consecutive days
- Maximum yardYardThe open space left between a building and its lot line — the space a setback creates. sale duration2 days
All yard sale permits are temporary in nature and shall be valid for no longer than two days
- Maximum yardYardThe open space left between a building and its lot line — the space a setback creates. sale permits per lot per year3 permits
No more than three permits will be issued per lot in a 12-month period
- Minimum customer parking spaces for food vendor4 spaces
A minimum of four parking spaces shall be provided for customers on-site.
- Minimum parkingMinimum parkingThe number of off-street spaces a development must provide before it may open. spaces for roadside stand4 spaces
Adequate parking for the activity intended, but no less than four parking spaces, shall be provided on-site.
- Minimum yardYardThe open space left between a building and its lot line — the space a setback creates. sale setbackSetbackThe distance a building must be held back from a lot line. from street10 ft
A setback of ten feet must be maintained from any street, front, side, or rear yard
From the ordinance
The following temporary activities, and activities of a similar nature, may be administratively approved in any zoning district by the zoning administrator through the issuance of a temporary use permit...