Danville, Virginia · General provision
Section D, Item 5 - Standards for the Special Floodplain District
FloodplainAll Danville districts0
Dimensional standards
Servicing
- Applies near
- Flood Insurance Rate Map
- Geographic extent
- Areas of special flood hazard designated as Zones A1-30 and AE on the Flood Insurance Rate Map.
Extracted standards
1 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Other
- No development unless cumulative effect does not increase BFE more than 1 foot1 ft
No new construction, substantial improvements, or other development (including fill) shall be permitted unless it is demonstrated that the cumulative effect of the proposed development, when combined with all other existing and anticipated development, will not increase the water surface elevation of the base flood more than one foot at any point within the City of Danville.
From the ordinance
Until a regulatory floodway is designated, no new construction, substantial improvements, or other development (including fill) shall be permitted within the areas of special flood hazard, designated as Zones A1-30 and AE on the Flood Insurance Rate Map, unless it is demonstrated that the cumulative effect of the proposed development, when combined with all other existing and anticipated development, will not increase the water surface elevation of the base flood more than one foot at any point within the City of Danville.