Dimensional standards
Servicing
- Geographic extent
- All floodplainFloodplainLand expected to flood at a stated frequency, where building carries extra conditions. areas
Extracted standards
5 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Other
- Base flood elevation data threshold (acresacre43,560 square feet — about the size of an American football field without the end zones.)5 acresacre43,560 square feet — about the size of an American football field without the end zones.
Base flood elevation data shall be obtained ... for subdivision proposals ... that exceed 50 lots or five acres, whichever is the lesser.
- Base flood elevation data threshold (lots)50 lots
Base flood elevation data shall be obtained ... for subdivision proposals ... that exceed 50 lots or five acres, whichever is the lesser.
- Adequate drainage
All subdivision proposals shall have adequate drainage provided to reduce exposure to flood hazards.
- Subdivision flood damage minimization
All subdivision proposals shall be consistent with the need to minimize flood damage.
- Public utilitiesPublic utilitiesInfrastructure serving the wider area — substations, pump stations, towers. and facilities flood protection
All subdivision proposals shall have public utilities and facilities such as sewer, gas, electrical and water systems located and constructed to minimize flood damage.
From the ordinance
All subdivision proposals shall be consistent with the need to minimize flood damage; ... Base flood elevation data shall be obtained from other sources or developed using detailed methodologies ... for subdivision proposals and other proposed development proposals (including manufactured home parks and subdivisions) that exceed 50 lots or five acres, whichever is the lesser.