Dimensional standards
Lot
- Minimum lot areaMinimum lot areaThe smallest parcel on which the district allows anything to be built.
- 30,000 sq ftsq ftSquare feet. An acre is 43,560 sq ft; a typical suburban lot is 7,000–10,000. (0.69 acacre43,560 square feet — about the size of an American football field without the end zones.)
- Minimum lot depth
- 200 ft
Height & bulk
Housing
Uses
Permitted by right29
- Agriculture
- Silvicultural activities
- Parks and recreation
- Park and ride facility
- Post office
- Public maintenance facility
- Utility service/minor
- Auction establishment
- Bank
- Business support service
- Business or trade school
- Construction office, temporary
- Equipment sales and rental
- General service and repair
- Mini warehouse
- Motor vehicle/outdoor storage
- Motor vehicle repair service/major
- Office, general
- Taxidermy
- Truck stop
- Contractor's yard
- Convenience center
- Custom manufacturing
- Industry, Type I
- Laboratory
- Warehousing and distribution
- Parking facility
- Reconstructed wetland
- Windmill
Conditional / special use13
Extracted standards
2 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Other
- Buffer yardYardThe open space left between a building and its lot line — the space a setback creates. adjacent to residential/agriculturalAgricultureRaising crops or livestock, generally including the structures that serve them.
a buffer yard is required on lots adjacent to residential and agricultural zoning districts (see section 5-400)
- Building separation for structures over 35 ft30 ft
Where structures exceed the 35-foot height requirement a building separation of 30 feet shall be required.
From the ordinance
This district is intended to provide an environment suitable for industrial activities that do not create appreciable nuisances, hazards or threats to the natural environment or surrounding development.