Dimensional standards
Servicing
- Geographic extent
- Areas identified as AE or AH zones on the FIRM
Extracted standards
1 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Other
- No increase in base flood elevation
No new construction, substantial improvements, or other development (including fill) shall be permitted unless the cumulative effect will not increase the water surface elevation of the base flood more than one foot.
From the ordinance
Until a regulatory floodway is designated, no new construction, substantial improvements, or other development (including fill) shall be permitted within the areas of special flood hazard, designated as Zones A1—30 and AE or AH on the FIRM, unless it is demonstrated that the cumulative effect of the proposed development, when combined with all other existing and anticipated development, will not increase the water surface elevation of the base flood more than one foot at any point within the County of Surry, Virginia.