Claremont, Virginia · General provision

Sec. 3-1519 and 3-1520

Dimensional standards

Servicing

Geographic extent
All special flood hazard areas within Surry County, Virginia

Extracted standards

18 individual requirements pulled out of this section’s prose, each with the sentence it came from.

Other

  • Accessory structures in the SFHA shall comply with the elevation requirements and other requirements of 3-1520(B), or if not elevated or dryproofed shall be limited to no more than 600 square feet in total floor area.

  • Accessory structures shall not be used for human habitation; be usable only for parking of vehicles or limited storage; be constructed with flood damage-resistant materials; be anchored to prevent flotation; have electrical service and mechanical equipment elevated to or above the base flood elevation; and be provided with flood openings.

  • Anchoring to prevent flotation

    New construction and substantial improvements shall be according to the VA USBC, and anchored to prevent flotation, collapse or lateral movement of the structure.

  • Flood carrying capacity

    The flood carrying capacity within an altered or relocated portion of any watercourse shall be maintained.

  • Flood openings requirements

    Provide a minimum of two openings on different sides of each enclosed area subject to flooding. The total net area of all openings must be at least one square inch for each square foot of enclosed area subject to flooding. The bottom of all required openings shall be no higher than one foot above the adjacent grade.

  • Flood-resistant materials

    New construction and substantial improvements shall be constructed with materials and utility equipment resistant to flood damage.

  • Manufactured homes shall be anchored to prevent flotation, collapse, or lateral movement.

  • Minimize flood damage

    New construction or substantial improvements shall be constructed by methods and practices that minimize flood damage.

  • Non-residential floodproofing elevation above BFE2 ft

    Buildings located in all A1—30, AE, and AH zones may be flood-proofed in lieu of being elevated provided that all areas of the building components below the elevation corresponding to the BFE plus two feet are water tight.

  • Non-residential lowest floor elevation above BFE1.5 ft

    New construction or substantial improvement of any commercial, industrial, or non-residential building (or manufactured home) shall have the lowest floor, including basement, elevated to or above the base flood level plus 18 inches.

  • Residential lowest floor elevation above BFE1.5 ft

    New construction or substantial improvement of any residential structure (including manufactured homes) in Zones A1—30, AE, AH and A with detailed base flood elevations shall have the lowest floor, including basement, elevated to or above the base flood level plus eighteen (18) inches.

  • Sanitary sewage protection

    New and replacement sanitary sewage systems shall be designed to minimize or eliminate infiltration of flood waters into the systems and discharges from the systems into flood waters.

  • Service facilities flood protection

    Electrical, heating, ventilation, plumbing, air conditioning equipment and other service facilities, including duct work, shall be designed and/or located so as to prevent water from entering or accumulating within the components during conditions of flooding.

  • Space below lowest floor use

    Fully enclosed areas below the regulatory flood protection elevation shall not be designed or used for human habitation, but shall only be used for parking of vehicles, building access, or limited storage of maintenance equipment.

  • Waste disposal protection

    On-site waste disposal systems shall be located and constructed to avoid impairment to them or contamination from them during flooding.

  • Water supply protection

    New and replacement water supply systems shall be designed to minimize or eliminate infiltration of flood waters into the system.

  • Watercourse alteration permit

    Prior to any proposed alteration or relocation of any channels or of any watercourse, stream, etc. within this jurisdiction a permit shall be obtained from the U.S. Corps of Engineers, the Virginia Department of Environmental Quality, and the Virginia Marine Resources Commission.

Overlay

From the ordinance

New construction and substantial improvements shall be according to the VA USBC, and anchored to prevent flotation, collapse or lateral movement of the structure.
Sec. 3-1519 and 3-1520