Claremont, Virginia · General provision

Sec. 3-1519

Extracted standards

5 individual requirements pulled out of this section’s prose, each with the sentence it came from.

Other

  • Anchoring to prevent flotation

    New construction and substantial improvements shall be according to the VA USBC, and anchored to prevent flotation, collapse or lateral movement of the structure.

  • Flood damage-resistant materials

    New construction and substantial improvements shall be constructed with materials and utility equipment resistant to flood damage.

  • On-site waste disposal systems

    On-site waste disposal systems shall be located and constructed to avoid impairment to them or contamination from them during flooding.

  • Sanitary sewage systems

    New and replacement sanitary sewage systems shall be designed to minimize or eliminate infiltration of flood waters into the systems and discharges from the systems into flood waters.

  • Water supply systems

    New and replacement water supply systems shall be designed to minimize or eliminate infiltration of flood waters into the system.

From the ordinance

New construction and substantial improvements shall be according to the VA USBC, and anchored to prevent flotation, collapse or lateral movement of the structure.