Cape Charles, Virginia · General provision

Article VI, Sec. 32-261

Historic PreservationAll Cape Charles districts0

Dimensional standards

Extracted standards

15 individual requirements pulled out of this section’s prose, each with the sentence it came from.

Fencing & walls

Other

  • Time to file appeal30 days

    which shall be taken within 30 days after the decision appealed from

  • Certificate expiration period12 months

    Any certificate issued pursuant to this article and any permit to raze a building issued pursuant to this article shall expire of its own limitation 12 months from the date of issuance if the work authorized thereby is not commenced by the end of such 12-month period.

  • Certificate of appropriateness required

    No building or structure, including signs, shall be erected, reconstructed, restored, or substantially altered in exterior appearance and no buildings or structures shall be razed or demolished within a historic district and no permit authorizing same shall be granted unless and until the same is approved by the harbor area review board and a certificate of appropriateness has been issued.

  • Time for harbor area review board decision60 days

    The harbor area review board shall render a decision upon any request or application for a certificate of appropriateness within 60 days after the filing of an application accepted as complete.

  • Delay of approval for negotiations3 months

    it may delay the effective date of an approval for a period of three months from the date of application or appeal to enable negotiations to be undertaken and completed for acquisition of the property for preservation or public use.

  • Harbor development certificate exemption

    Activities requiring a harbor development certificate, as described in section 32-79, are exempt from requiring a certificate of appropriateness.

  • Hazardous building exemption from review

    Nothing in this article shall prevent the razing or demolition of any building or structure without consideration of the harbor area review board which is in such an unsafe condition that it would endanger life or property.

  • Time to remedy maintenance violation90 days

    the owner or person in charge of said structure shall have 90 days to remedy such violation.

  • Creation of outside storage having a structure footprint of less than 41 square feet in a commercial or industrial district which does not require structural changes or major grading and is not visible from a public street or waterway.

  • No reapplication period after denial12 months

    No subsequent application under section 32-281(a) regarding the contributing structure may be made until more than one year after a final denial by the town council.

  • Railroad activities exemption

    Railroad activities in this district are subject to federal preemption to the extent that the activities are an integral part of the railroad's interstate operations.

Parking

  • Maximum parking spaces for exemption5 spaces

    Construction of off-street loading areas and off-street parking areas containing five spaces or less in a commercial or industrial district.

Signage

  • any permitted non-illuminated flat or wall sign not exceeding three inches from a wall and not exceeding four square feet in area in a commercial or industrial district.

  • Maximum sign projection for exemption3 in

    any permitted non-illuminated flat or wall sign not exceeding three inches from a wall and not exceeding four square feet in area in a commercial or industrial district.

From the ordinance

The intent of the historic harbor area overlay district is to encourage development and redevelopment that is architecturally compatible with existing and previously existing development in the Cape Charles Harbor area, as well as in the neighboring area within the adjacent historic district overlay.
Article VI, Sec. 32-261