Sec. 32-83
Dimensional standards
Lot
Height & bulk
Housing
- Two-family
- by_right
- Three-family
- by_right
- Four-plus family
- by_right
Parking
- Minimum, studio / 1-bedroom
- 1
- Minimum, 2+ bedroom
- 2
Uses
Permitted by right2
- All uses permitted by-right in R-3 District except short-term rentals and electric vehicle charging stations
- Accessory uses as permitted in R-3 District
Conditional / special use4
- All uses in C-1, C-2, and C-3 Districts
- Conditional uses within the R-3 District
- Short term rentals (including subletting of units less than 1,000 sq ft, 30 days or less)
- Any other commercial or professional use compatible
Extracted standards
7 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Height
- Commercial building heightMaximum heightThe tallest a building may be, given in feet, in storeys, or both — whichever binds first.35 ft
Buildings may be erected up to a height of 35 feet from the adjacent ground elevation for commercial development.
Other
- Maximum townhouseTownhouseA single-family home sharing side walls with its neighbours, each on its own lot. units in row25 units
No more than 25 town-house dwelling units shall be constructed or attached together in a continuous row, and no such row shall exceed 240 feet in length.
- Maximum townhouseTownhouseA single-family home sharing side walls with its neighbours, each on its own lot. row length240 ft
No such row shall exceed 240 feet in length.
- Minimum lot widthLot widthHow wide a lot must be, usually measured at the front setback line. for multi-familyMultifamily dwellingA building of four or more dwelling units. Where zoning is most restrictive.60 ft
No multi-family unit may be erected on a lot which has a width at the building line of less than sixty feet.
- Open spaceOpen spaceLand a development must leave unbuilt, sometimes required to be usable or planted. percentage10 pct
Open space shall be provided equivalent to ten percent of lot area for multi-family projects.
- Primary access
All development on the parcel shall maintain primary access (and signage, if applicable) to Cassatt Parkway via the Main Street access road.
Parking
- Parking distance from dwelling200 ft
No such parking lot or garage shall be located more than 200 feet from the dwelling unit which it serves.
From the ordinance
The following standards shall apply: Minimum of five acres for the PUD District. Townhouse projects must have minimum of one acre... Multi-family projects must have minimum of one acre... Commercial projects must have minimum of ¼ acre...
Parking requirements
{
"townhouse": "2 spaces per dwelling unit",
"multi-family": "1 space per one bedroom dwelling unit or studio, otherwise 2 spaces per dwelling unit"
}