Extracted standards
4 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Other
- DistrictZoning districtA mapped area with one set of rules, identified by a code like R-1 or B-2. boundary along street centerline
Where district boundaries are indicated as approximately following or being at right angles to the center lines of streets, highways, alleys or railroad main tracks, such center line or lines at right angles to such center lines shall be construed to be such boundaries
- DistrictZoning districtA mapped area with one set of rules, identified by a code like R-1 or B-2. boundary along water body
Where a district boundary is indicated to follow a river, creek or branch or other body of water, said boundary shall be construed to follow the center line of low water or at the limit or jurisdiction of the Town of Bowling Green.
- Construction commencement after permit30 days
such construction must commence within 30 days after this article becomes effective
- Construction discontinuation period6 months
If construction is discontinued for a period of six months or more, further construction shall be in conformity with the provisions of this article
From the ordinance
Nothing contained herein shall require any change in the plans or construction of any building or structure for which a permit was granted prior to the effective date of this article. However, such construction must commence within 30 days after this article becomes effective. If construction is discontinued for a period of six months or more, further construction shall be in conformity with the provisions of this article for the district in which the operation is located.