Extracted standards
2 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Other
- Maximum lot coverageLot coverageThe share of a lot that buildings may cover, as a percentage. determined through preliminary development plan
Maximum lot coverage shall be determined through the preliminary development plan process.
- Multiple principal structures allowed
More than one (1) principle structure may be placed on a lot.
From the ordinance
(1) More than one (1) principle structure may be placed on a lot. (2) Maximum lot coverage shall be determined through the preliminary development plan process.