Extracted standards
2 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Other
- Maximum curb cuts per street frontageFrontageThe length of a lot line that touches a public street.2 count
A maximum of two (2) curb cuts shall be allowed per street frontage of any lot.
- Underground utilities required
All utility lines (electric, telephone, cable television lines, etc.) shall be placed underground.
From the ordinance
A maximum of two (2) curb cuts shall be allowed per street frontage of any lot. All utility lines (electric, telephone, cable television lines, etc.) shall be placed underground.