Extracted standards
15 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Other
- AccessoryAccessory useA secondary activity customarily incidental to the main use of the lot — a garage, a home office. structure area exemption20 sqftsq ftSquare feet. An acre is 43,560 sq ft; a typical suburban lot is 7,000–10,000.
Accessory structures less than six (6) feet in height and twenty (20) square feet in area.
- AccessoryAccessory useA secondary activity customarily incidental to the main use of the lot — a garage, a home office. structure heightMaximum heightThe tallest a building may be, given in feet, in storeys, or both — whichever binds first. exemption6 ft
Accessory structures less than six (6) feet in height and twenty (20) square feet in area.
- Appeal period30 days
Every written notice of violation... shall include a statement informing the recipient that he or she may have a right to appeal within thirty (30) days.
- Certificate of zoning compliance issuance time7 days
The Town shall issue or deny any application for a certificate of zoning compliance within seven (7) days.
- Civil penalty first violation200 dollars
Civil penalty of two hundred dollars ($200.00) for the first violation.
- Civil penalty second violation350 dollars
Civil penalty of three hundred fifty dollars ($350.00) for the second violation.
- Civil penalty third violation500 dollars
Civil penalty of five hundred dollars ($500.00) for each additional violation thereafter.
- Criminal fine maximum1,000 dollars
Punishable by a fine of not less than ten dollars ($10.00) nor more than one thousand dollars ($1,000.00).
- Criminal fine minimum10 dollars
Punishable by a fine of not less than ten dollars ($10.00) nor more than one thousand dollars ($1,000.00).
- Notice of violation correction time15 days
The Administrator may establish a reasonable time period for the correction of the violation; however, in no case shall such time period exceed fifteen (15) days.
- Performance guarantee waiver amount500 dollars
The Administrator shall have the authority to waive the performance guarantee if the unfinished improvements have an estimated value of less than five hundred dollars ($500.00).
- Second notice compliance time7 days
The second notification shall request compliance within a period not to exceed seven (7) days.
- Temporary certificate validity6 months
Temporary or partial certificates of zoning compliance shall be valid for a period not to exceed six (6) months.
A variance shall be granted if the evidence shows that the strict application of the terms of the ordinance would unreasonably restrict the utilization of the property or that the granting of the variance would alleviate a hardship due to a physical condition... and the following are shown: ...
- Zoning permit validity6 months
All zoning permits issued shall be valid for a period of six (6) months.
From the ordinance
This Appendix shall be administered and enforced by a Zoning Administrator, who shall be appointed by the Director of Planning and Building.