Blacksburg, Virginia · General provision

Sec. 1200-1214

Extracted standards

15 individual requirements pulled out of this section’s prose, each with the sentence it came from.

Other

  • Accessory structures less than six (6) feet in height and twenty (20) square feet in area.

  • Accessory structures less than six (6) feet in height and twenty (20) square feet in area.

  • Appeal period30 days

    Every written notice of violation... shall include a statement informing the recipient that he or she may have a right to appeal within thirty (30) days.

  • Certificate of zoning compliance issuance time7 days

    The Town shall issue or deny any application for a certificate of zoning compliance within seven (7) days.

  • Civil penalty first violation200 dollars

    Civil penalty of two hundred dollars ($200.00) for the first violation.

  • Civil penalty second violation350 dollars

    Civil penalty of three hundred fifty dollars ($350.00) for the second violation.

  • Civil penalty third violation500 dollars

    Civil penalty of five hundred dollars ($500.00) for each additional violation thereafter.

  • Criminal fine maximum1,000 dollars

    Punishable by a fine of not less than ten dollars ($10.00) nor more than one thousand dollars ($1,000.00).

  • Criminal fine minimum10 dollars

    Punishable by a fine of not less than ten dollars ($10.00) nor more than one thousand dollars ($1,000.00).

  • Notice of violation correction time15 days

    The Administrator may establish a reasonable time period for the correction of the violation; however, in no case shall such time period exceed fifteen (15) days.

  • Performance guarantee waiver amount500 dollars

    The Administrator shall have the authority to waive the performance guarantee if the unfinished improvements have an estimated value of less than five hundred dollars ($500.00).

  • Second notice compliance time7 days

    The second notification shall request compliance within a period not to exceed seven (7) days.

  • Temporary certificate validity6 months

    Temporary or partial certificates of zoning compliance shall be valid for a period not to exceed six (6) months.

  • A variance shall be granted if the evidence shows that the strict application of the terms of the ordinance would unreasonably restrict the utilization of the property or that the granting of the variance would alleviate a hardship due to a physical condition... and the following are shown: ...

  • Zoning permit validity6 months

    All zoning permits issued shall be valid for a period of six (6) months.

From the ordinance

This Appendix shall be administered and enforced by a Zoning Administrator, who shall be appointed by the Director of Planning and Building.
Sec. 1200-1214